The Pipe Support Blog

Hold-Down Clamp Assembly Fabricated for a 54" Suction Line

Posted by Ra Bass on Feb 27, 2011
Drawing of Complete Assembly (including hold-down clamp, pedestals and beams)

Drawing of Complete Assembly

Pedestals and Beams in Operation

Pedestals and Beams in Operation

The 54" suction line carrying gas to a gas compressor at a rate of 1.7 million lb./hr. developed a severe vibration. The deflections in the line were up to 3/4" and it was fully observable during operation.

Hold-down Clamp in OperationPT&P designed and manufactured a special elevated hold-down clamp, including a unique laminated vibration dampening lining. The entire pipe hanger assembly stands 22' high and is coated with a carboline zinc finish. After installation and resumption of operations, the vibrations are now almost imperceptible.

 

 

 

 

 

 

Want to learn more about pipe clamps? View a recording of our pipe clamp webinar now!

Click me

Tags: Hold Down Clamps, Support Assembly Components

Large Custom "Sling" Pipe Support and Horizontal Traveler Assemblies

Posted by Sylvia Ibarra on Feb 21, 2011

Large Custom "Sling" Support and Horizontal Traveler Assemblies for an Oil Refinery

Three custom "sling" pipe support assemblies fabricated from stainless steel were designed for an oil refinery in Louisiana. The assemblies are comprised of a 79.25" diameter custom saddle support and two horizontal travelers (Fig.270 PTP-4). They are capable of loads up to 44,000 lb., and were designed, fabricated and shipped in four weeks for expedited delivery.

Do you have a requirement for a large custom designed product? Get pricing today!

Click me

Tags: horizontal travelers, custom "sling" support

Hydraulic Snubbers (Fig. 511 AD) with Protective Boots

Posted by Sylvia Ibarra on Feb 14, 2011

Hydraulic Snubbers (Fig. 511 AD) with Protective Boots Designed for a Hydro-sulfuric Acid Environment in a Geothermal Power Plant   Hydraulic Snubbers (Fig. 511 AD) with Protective Boots Designed for a Hydro-sulfuric Acid Environment in a Geothermal Power Plant
Fronek Anchor/Darling, a division of PT&P, designed and manufactured hydraulic snubbers with protective boots for a hydro-sulfuric acid environment in a geothermal power plant. They measure 53-5/8" pin-to-pin with a 3-1/4" cylinder bore size and 6" stroke.

The snubbers are designed for an actual load of 15,400 lb., but have a rated load capacity of 20,000 lb. They are fabricated from carbon and alloy steel, and include two coats of epoxy-based paint. An activation velocity test was performed, along with a release rate and drag characteristics test.

Need further assistance selecting your snubber?
> contact our team of engineers
> submit a request for quote
> view more information on Snubbers Need further assistance selecting your snubber?

Tags: Hydraulic Snubber, Shock Control, Restraint & Support Devices